[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"content:layout":3,"content:article:blykallas-ceo-jacob-stedman-on-advanced-nuclear-power":78},{"footer":4,"header":64,"loader":76},{"addresses":5,"companyDetails":15,"copyright":18,"infoLinks":19,"legalLinks":26,"motto":33,"navigateLinks":34,"sites":56,"tagline":63},[6,9,12],{"city":7,"lines":8},"Stockholm","Sveavägen 25, 111 34 Sweden",{"city":10,"lines":11},"New York","190 Bowery, New York, NY, 10012",{"city":13,"lines":14},"Austin","801 Barton Springs Rd, Austin, TX, 78704",[16,17],"Reg. no 556939-7168","info@blykalla.com","© 2026 Blykalla",[20,23],{"label":21,"url":22},"YouTube","https:\u002F\u002Fwww.youtube.com\u002F@Blykalla",{"label":24,"url":25},"LinkedIn","https:\u002F\u002Fwww.linkedin.com\u002Fcompany\u002Fblykalla",[27,30],{"label":28,"link":29},"Cookie Policy","\u002Fcookie-policy",{"label":31,"link":32},"Whistleblowing","https:\u002F\u002Fhaileyhr.app\u002Fwhistleblowing\u002Fee285a3c-45de-4d5f-b3c8-155bf1e41b4b","A New Paradigm\u003Cbr>for Nuclear",[35,38,41,44,47,50,53],{"label":36,"link":37},"Home","\u002F",{"label":39,"link":40},"Technology","\u002Ftechnology",{"label":42,"link":43},"Projects","\u002Fprojects",{"label":45,"link":46},"Story","\u002Fstory",{"label":48,"link":49},"News","\u002Fnews",{"label":51,"link":52},"Careers","https:\u002F\u002Fcareers.blykalla.com\u002F",{"label":54,"link":55},"Invest","\u002Finvest",[57,60],{"label":58,"link":59},"Park Tierp","\u002Ftierp",{"label":61,"link":62},"Park Norrsundet","\u002Fnorrsundet","BASELOAD BY BLYKALLA",{"navigation":65},[66,68,70,72,74],{"_key":67,"label":36,"link":37},"3edb3545033b",{"_key":69,"label":39,"link":40},"f5f8a0a28350",{"_key":71,"label":42,"link":43},"8e562000251a",{"_key":73,"label":45,"link":46},"b350b12abbb3",{"_key":75,"label":48,"link":49},"ec4d655ce486",{"introText":77},"Power where and when it’s needed",{"article":79,"recent":115},{"_updatedAt":80,"category":81,"date":82,"excerpt":83,"image":84,"photoCredit":89,"related":89,"sections":90,"title":83},"2026-09-09T13:19:09Z","news","2024-03-14","Video series of Blykalla's CEO Jacob Stedman on Advanced Nuclear Power",{"_type":85,"asset":86},"image",{"_ref":87,"_type":88},"image-ee94abf3afd84edfd5eab33fc979fb082dda65db-1144x772-png","reference",null,[91],{"content":92,"quotes":89,"subtitle":89,"title":89},[93],{"_key":94,"_type":95,"children":96,"markDefs":111,"style":114},"f17c2605-bd3","block",[97,102,107],{"_key":98,"_type":99,"marks":100,"text":101},"847e8903-0fe","span",[],"We are happy to launch a short video series of our CEO Jacob Stedman's presentation from the Blykalla Industry Event, January 24th 2024. The full series is available on our ",{"_key":103,"_type":99,"marks":104,"text":106},"3e4602bc-285",[105],"f29e0df5-108","Youtube",{"_key":108,"_type":99,"marks":109,"text":110},"32408bbc-2da",[],", as well as linked below. ",[112],{"_key":105,"_type":113,"href":22},"link","normal",[116,127,136,145,154,163],{"_id":117,"category":118,"date":119,"excerpt":120,"externalUrl":89,"image":121,"slug":124,"title":120},"0ef5b3f7-29bf-4576-93a9-5bd9b2db6d48","press-release","2026-10-26","Blykalla and NEEXT strengthen cooperation on SEALER Development",{"_type":85,"asset":122},{"_ref":123,"_type":88},"image-5ff42e40bb24b74af0f19720e71b30c5b7694bc1-1943x1294-png",{"_type":125,"current":126},"slug","blykalla-and-neext-strengthen-cooperation-on-sealer-development",{"_id":128,"category":81,"date":129,"excerpt":130,"externalUrl":89,"image":131,"slug":134,"title":130},"fa8dae75-8ad5-47c5-a523-3971003edf20","2026-10-15","Blykalla's Norrsundet Project Enters Next Phase as Site Plan Is Presented",{"_type":85,"asset":132},{"_ref":133,"_type":88},"image-c8ea5cffd9c55d1982f166d36603154f6fa35e9b-5504x3072-jpg",{"_type":125,"current":135},"blykalla-s-norrsundet-project-enters-next-phase-as-site-plan-is-presented",{"_id":137,"category":81,"date":138,"excerpt":139,"externalUrl":89,"image":140,"slug":143,"title":139},"0e4578a4-8b61-4661-b639-de68c8deae8a","2026-10-14","Blykalla Featured on the Norrsken100 for the Second Time",{"_type":85,"asset":141},{"_ref":142,"_type":88},"image-3e1f45f541c81fba78d91cf8ec812ef07c842b06-2048x1365-jpg",{"_type":125,"current":144},"blykalla-featured-on-the-norrsken100-for-the-second-time",{"_id":146,"category":118,"date":147,"excerpt":148,"externalUrl":89,"image":149,"slug":152,"title":148},"5583054f-72f6-404c-bcb7-e92539296cd3","2026-09-15","Blykalla and Microsoft Collaborate to Advance AI-driven Nuclear Licensing for its Lead-Cooled Advanced Nuclear Reactor",{"_type":85,"asset":150},{"_ref":151,"_type":88},"image-faa75ab64eb9f9ce6508c56cb56fa4447c8a0370-1920x1080-jpg",{"_type":125,"current":153},"blykalla-and-microsoft-collaborate-to-advance-ai-driven-nuclear-licensing-for-its-lead-cooled",{"_id":155,"category":118,"date":156,"excerpt":157,"externalUrl":89,"image":158,"slug":161,"title":157},"5f508596-d607-47b8-9cb2-db9cd08d27eb","2026-09-01","‍Blykalla Expands U.S. Presence with New Technical Hub in Austin",{"_type":85,"asset":159},{"_ref":160,"_type":88},"image-10dc9249104cd09228d219f79f9d687e5354764c-2000x1334-png",{"_type":125,"current":162},"blykalla-expands-u-s-presence-with-new-technical-hub-in-austin",{"_id":164,"category":118,"date":165,"excerpt":166,"externalUrl":89,"image":167,"slug":170,"title":166},"18a61670-e647-477f-8ea7-2287fa2eb9ab","2026-08-31","Blykalla Applies for Government Financing for Advanced Reactor Park in Tierp",{"_type":85,"asset":168},{"_ref":169,"_type":88},"image-f85831e403e753cff6f2c38f1dbf485b2e4cab11-5504x3072-png",{"_type":125,"current":171},"blykalla-applies-for-government-financing-for-advanced-reactor-park-in-tierp"]